Fleet management performance monitoring / by Paul Kauffmann, Richard Williams, Department of Engineering, East Carolina University ; and John Hildreth, Department of Engineering Technology and Construction Management., UNC Charlotte.
"The principle goal of this project was to enhance and expand the analytical modeling methodology previously developed as part of the 'Fleet Management Criteria: Disposal Points and Utilization Rates' project completed in 2010. The enhanced and expanded methods were focused on the management and analysis of equipment, usage, costs, and optimal life cycle for equipment in the NCDOT equipment fleet. Most important, a strategic goal was to develop, test, and refine a flexible and capable analytical model which can serve the long term management needs of the Fleet and Material Management Unit"--page vii.
Electronic resources
Record details
- Physical Description: viii, 196 pages : illustrations ; 28 cm
- Publisher: [Raleigh, N.C.] : North Carolina Dept. of Transportation, [2013]
Content descriptions
- General Note:
- "May 15, 2013.""NCDOT project 2012-07, FHWA/NC/2012-07, May 2013"--Cover.
- Bibliography, etc. Note:
- Includes bibliographical references (pages 63-70).
- Formatted Contents Note:
- Project introduction and overview -- Literature search -- Data collection and summary -- Economic model description -- Spreadsheet analysis and modeling application -- Results -- Conclusion and recommendations.
- Additional Physical Form available Note:
- Also available online.
Search for related items by subject
Available copies
- 4 of 5 copies available at NC Cardinal. (Show)
- 0 of 0 copies available at Onslow County Public Library.
Holds
- 0 current holds with 5 total copies.
Show Only Available Copies
| Location | Call Number / Copy Notes | Barcode | Shelving Location | Status | Due Date |
|---|
